Our Other Significant Projects
  Chocolate Basement Upgradation . S5 to S7 and COROS to Wincc
  MES for vehicle assembly plant
  Vertical Tubular Continuous Bagger with 4-Head Belt Weigher (FFS)
  RFID based LPG Cylinder Tracking System
  Sort Allocation Computer for Zine El Abidine Ben Airport, Enfidha, Tunisia
 Significant Projects
 
Project Details
Domain  
Project   Rail Handling Plant (Bhilai)
Executed in  
Sales Order No   FOX\0304\NOR143
Work Order No   FOX_35
Client  
Consultant  
Project Highlight  
  • Automated storage, tracking and retrieval and wagon loading of finished rail
  • Rail lengths of 13m to 78m
  • Rail supported at every 6.5m by independent rail handling crane
  • Synchronized operation of 26 such cranes for vertical and horizontal positioning.